$1,644,700.00 | POP 07/01/2020 – Current



The work includes removal and replacement of the membrane and bedding materials within the fire pit as well as the trench running between the fire pit and pumping unit. The plumbing lines to the pit as well as all associated pumps and lines between the fuel storage tank and water storage pond are also being replaced. The existing burn house training facility will get new lighting and area lighting for the entire facility.