Breakroom Remodel

The work for this project consisted of the removal of existing cabinets, countertops, and the sink in the Break Room (177). Then replace and install new laminated cabinets, new laminated countertops, a new sink with faucets and drain, new water line hook up for a future ice machine and new electrical plugmold above the countertop.