Repair Hangar Ceiling, Dock 82- Ellsworth AFB

Demo all Mechanical, Electrical, Plumbing and Fire Suppression off of ceiling that was mounted to/ underneath the sheetrock. Demo 23,000 Sq Ft of sheetrock off of the hanger ceiling. Clean all of the open metal framing that is now exposed and repaint entire roof structure inside. Install new metal liner panels on walls above where sheetrock ceiling was. Approximately 3,000 sq ft. Install new Mechanical, Electrical, Plumbing and Fire Suppression throughout. Install new metal roof system. Approximately 28,000 sq ft of standing seam metal roof.