Repair Waterline Crossing-Ellsworth-Twinning

This project consists of the investigative and design services, surveying, design, and installation of two water main casings. The construction also includes surface restoration, utility relocation, importing and placing topsoil, reseeding disturbed areas, erosion control and other incidental work.