$974,507.57 | POP 2/19/19 – 11/18/19



Pro-Mark Services, Inc has been awarded the contract to. This project consists of rehabilitating the existing industrial waste pretreatment facility (FAC 3015) and the construction of a masonry dewatering building adjacent to FAC 3015. A smaller portion of the project will consist of site improvements in and around FAC 3015 including grading, utility work, asphalt pavement and other incidental work. The contractor shall adjust or shall arrange to have adjusted, utilities that are in conflict with new construction. The contractor shall be responsible for adjusting any water, gas, communication line, and electrical lines.